Welcome to phase I of our kitchen makeover. This past week, we have had the soffit removed, lighting replaced and re-wired (we won't hang the pendant until the end so we don't break them getting the island in), and the countertops and backsplash removed. Our cat has had a vacation at C's mom's house and Ritz has been going to work with C. It has been much easier without them in the worker's hair all week.
Phase 2 (this week) consists of templates for the granite, the beginning of building the island (off site), confirming the paint color of the cabinets and the final cabinet design, and rehanging of cabinets. The granite people were supposed to come Friday; but had to cancel, so they will be here today. It can't come soon enough--I'm ready to have a sink and running water in the kitchen again. Also, once the mudding of the drywall is done, we will try to paint this week because the cabinets are getting refinished next week. We have settled on continuing the khaki hallway color (called Ponytail).
Clean freak hubby is at his wits end already. We cleaned the house today and did the best we could picking up the kitchen, but the dust is clearly getting to him (and the rest of the house). Hopefully, we will be done with everything by the beginning of July. It is amazing how much bigger the space looks without the soffit and without the dark cabinets. I am thrilled to be having a light, bright, and airy kitchen hopefully!
BEFORE:
We covered our stove so it won't get too dusty and beat up.
Our dining room, turned into makeshift kitchen cabinets. It is amazing how much we had in those things--this is only our upper cabinets.
The location and dimension of our island/breakfast bar (with the spot marking the middle for the pendant lighting).
DAY ONE: MONDAY
Soffit and lighting removed. If you look closely at the beams, you will realize our builder chopped up our load bearing wall to put duct-work through them. We had to rebuild support beams to fix this problem. They also began the backsplash removal. For whatever reason, the backsplash ran up to soffit, so the cabinets had to be removed completely.
DAY TWO: TUESDAY
The electrician came and installed the can lighting (also known as the five suns as they are so bright) and moved the wiring for the pendants to be centered over the island We opted for the extra bright halogen reflective cans, which should be great to ensure we have enough light in our kitchen. We are debated about installing under cabinet lighting as well. Thoughts on this? We are waiting to see how bright it is with the cabinets re-hung before making any final decisions either way.
We also determined the vent is necessary for our advantium cooker, so we will have to build a cabinet to fit around it.
Here is the only way we can repair our load bearing wall: installing 2x4s between the beams to keep them stable and aligned. We also found live wires that had to be stripped.
Every room has turned into a storage room. Our poor mudroom has doubled as our coffee bar.
DAY THREE:WEDNESDAY
Drywall is hung and the beginning of clean up.
DAY FOUR: THURSDAY
Drywall is in the process of mudding and the countertops and sink are removed so that the granite company can come make their proper template.